Vac Truck
A typical GML Coating restoration project begins by controlling any flow coming into the work area. Prep work begins by sandblasting, then power washing the surface area. All debris is then removed from the worksite. Active Leak Stop infiltration will then be injected. GML 30/60 cementitious concrete will be applied. After the work area is completely dried, Green Monster products will be applied to the dry and cooling substrate, providing maximum adhesion.